Automazioni Industriali

The conveyor belt loads the cake, coming from stuffing, under the cutter, whose cycle period (both cutting and pendulum) is calculated according to the desired snack size (settled by the operator on the screen of interface HMI) and, of course, the conveyor belt speed.



ultimo aggiornamento: 13 Aprile 2010